WE'RE STILL DISPATCHING ORDERS AS NORMAL. READ OUR FULL CORONAVIRUS UPDATE.
4.2v Charger for Manual Vgo2 Batteries

Further information

4.2v Charger for Manual Vgo2 Batteries (Long Lead)

Availability: In stock

Was: £4.99

Now: £0.05

FREE DELIVERY on all UK orders over £40

4.7
16 Reviews 16
  • Description

    USB Charger for the Vgo2 4.2v Manual Batteries Long Lead.

    • This charger operates in the same way as our standard Vgo2 USB charger, but incorporates a short lead to allow a more flexible charging position.
    • Not suitable for use with our Auto Vgo2 batteries.
    • Input: 5v DC 500mA
    • Output: 4.2v DC 420mA

    JAC Vapour advises all customers to only use official chargers and charging adapters with their batteries. Use of third party chargers or adapters is done so at the customer's own risk, and we cannot accept responsibility for damage caused as a result of using such products.

    Please follow standard battery safety guidelines when charging your batteries: Terms and Conditions.

  • Delivery

    POPULAR TRACKED: (3 to 5 working days)

    RAPID TRACKED: (1 to 2 working days)

    STANDARD NON-TRACKED: (3 to 5 working days)

    ROYAL MAIL 1ST CLASS (NON-TRACKED): (1 to 2 working days)

    ROYAL MAIL 2ND CLASS (NON-TRACKED): (2 to 3 working days)

    Please note, orders placed after 1pm on Friday will ship Monday morning. We try to ship everything ordered before 1pm on the same day, however this is not always guaranteed.

    More info on UK and international deliveries

  • Returns

    Coronavirus Update

    For the next wee while, there will be one area where we shall have to make to make some changes to how we work, and that is our approach to customer returns. From this point on we can not accept any returns to our head office address, which means all warranty returns for exchange, refund or repair are temporarily suspended until further notice.

    We’ll do our utmost to diagnose and troubleshoot problems remotely and ask for your assistance in providing photographs or videos to help to do so. This will ensure that where required we can continue to issue replacements.

    Any 14 day returns (due to a change of mind etc) will be authorised as normal, but please allow up to an additional week for these to be processed.

    None of this affects your statutory rights, or our 14 day no quibble returns policy, but we ask customers to be patient while we do our best to process things as quickly as possible. Once the current lockdown period ends and we are able to return to the office and handle returns, we’ll be happy to pick up any outstanding cases.

    14 day Money Back Guarantee and Warranty

    More information on our returns policy

Customer Reviews for the 4.2v Charger for Manual Vgo2 Batteries (Long Lead)

  • Faulty but it does charge - by Jodie, 24 May 2016
    1
    This does charge but the light on mine stays red, even after hours and hours so I have to guess when the batteries are fully charged.....................JAC Vapour: Hi Jodie, the 4.2v Vgo2 charger is for Manual Vgo2 batteries, as far as I can see you only have V3i batteries so this charger will not work with them, you need the 5v V3i charger for both the manual and auto V3i batteries. When charging V3i batteries the tip of the battery will light up and then go out when fully charged. Please contact support and they will help you make sure you are suing the correct charger.
  • Good product - by amanda, 1 December 2015
    5
    Well made not flimsy and charges my vgo2 batteries quickly. Has a light that changes from red to green to let you know charging is complete.
  • Great - by Helen, 20 May 2014
    5
    Great charger for use with variable voltage battery ,doesn't take long at all to charge.
  • Great does the job ! - by Laura, 5 May 2014
    5
    Charges my vgo2 vv with ease and quickly easy to plug into laptop and the extra bit of lead helps out too.
  • Very good - by Lorrina, 7 August 2013
    5
    Good for those situations when you need the extra length of the lead in small spaces or when the plug is in an awkward place near floors etc (such as in hotel rooms sometimes and you just can't fit the batter in). Always worth having a spare.
  • Excellent - by Dave, 24 July 2013
    5
    I managed to leave my original charger in Tenerife. Ordered a replacement which turned up 2 days later and very happy.
  • Best quality - by Gareth, 4 July 2013
    5
    The lead does exactly what it says, it's very well built and charges up my Vgo 2 VV incredibly quickly.
  • Good quality lead - by Adam, 15 June 2013
    3
    Good quality lead. Expensive - yes - but convenient :-)
  • Good - by Tom, 14 June 2013
    5
    I brought this product as a spare (my original lead that is over a year old still works fine!). All in all cant fault it, does the job and seems well built.
  • Why havent you got a spare?!?!?! - by Scotty, 6 June 2013
    5
    At this price, Its worth having at least one extra as a spare.

    If you break your only charger you're going to be stuffed till you can get a replacement sent out......... Is it really worth going without your vapour for 24 to 48 hours while you're waiting for another charger to turn up in the post?

    A spare charger should fall into the category of "Essential kit", Not "A luxury that would be nice to get" !!!!!!

    Happy vaping all.
    Scotty.

View all customer reviews Write a customer review

You could receive 20 Gold Points for writing a review and/or rating this product.