4.2v USB Charger for 510 Manual Batteries (Long Lead)

Availability: In stock

£4.99

FREE DELIVERY on all UK orders over £50

4
9 Reviews 9
  • Description

    Long Lead USB Charger for use with our JAC 510 4.2v manual batteries.

    This charger operates in the same way as our standard Vgo2 USB charger, but uses the 510 fitting that is only compatible with our JAC 510 range.

    Not suitable for use with our Vgo2 range of batteries.

    Input: 5v DC 500mA

    Output: 4.2v DC 420mA

    JAC Vapour advises all customers to only use official chargers and charging adapters with their batteries. Use of third party chargers or adapters is done so at the customer's own risk, and we cannot accept responsibility for damage caused as a result of using such products.

    Please follow standard battery safety guidelines when charging your batteries: Terms and Conditions.

  • Delivery

    POPULAR TRACKED: (3 to 5 working days)

    RAPID TRACKED: (1 to 2 working days)

    STANDARD NON-TRACKED: (3 to 5 working days)

    Please note, orders placed after 1pm on Friday will ship Monday morning. We try to ship everything ordered before 1pm on the same day, however this is not always guaranteed.

    More info on UK and international deliveries

  • Returns

    14 day Money Back Guarantee and Warranty

    More information on our returns policy