The long lead USB charger
Another view of the long lead USB charger
A different view of the long lead charger

Further information

4.2v USB Charger for 510 Manual Batteries (Long Lead)

Availability: In stock

£4.99

FREE DELIVERY on all UK orders over £40

4
9 Reviews 9
  • Description
    • Long Lead USB Charger for use with our JAC 510 4.2v manual batteries.
    • Not suitable for use with our Vgo2 range of batteries.
    • Input: 5v DC 500mA
    • Output: 4.2v DC 420mA

    This charger operates in the same way as our standard Vgo2 USB charger, but uses the 510 fitting that is only compatible with our JAC 510 range.

    JAC Vapour advises all customers to only use official chargers and charging adapters with their batteries. Use of third party chargers or adapters is done so at the customer's own risk, and we cannot accept responsibility for damage caused as a result of using such products.

    Please follow standard battery safety guidelines when charging your batteries: Terms and Conditions.

  • Delivery

    POPULAR TRACKED: (3 to 5 working days)

    RAPID TRACKED: (1 to 2 working days)

    STANDARD NON-TRACKED: (3 to 5 working days)

    Please note, orders placed after 1pm on Friday will ship Monday morning. We try to ship everything ordered before 1pm on the same day, however this is not always guaranteed.

    More info on UK and international deliveries

  • Returns

    14 day Money Back Guarantee and Warranty

    More information on our returns policy

Customer Reviews for the 4.2v USB Charger for 510 Manual Batteries (Long Lead)

  • Excellent Customer Service - by lucinda, 29 December 2016
    5
    I stupidly ordered this charger by mistake. Jac let me exchange it for the correct charger replying very quickly to my email.
  • Infuriating things! - by Nic, 21 July 2016
    1
    I have only ever left really positive reviews for JAC as on the whole I think they are brilliant, but these chargers really drive me mad. None of mine have ever lasted more than a month or so. I have three right in front of me here that a precariously balanced in various positions just to get the connection just right to charge as there is obviously a faulty wire somewhere. I think I've had two over the time that haven't done this, but the rest... Drives me mad as I am so careful not to pull them about and I look after them, but to no avail. .....................JAC Vapour ltd: I am sorry you are having these sort of issues, but this isn't normal, something else must be going on. Do you always charge using the same plug or socket, have you tried variations, and does this have an effect. Are the batteries new, and does it happen with all batteries. The chargers are a relatively cheap bit of kit, but not to the extent they fail in a month, I used the 510 kit for 6 months and never had an issue. I did check back through your orders I can only see 2 chargers for the Vgo2 auto bought in the last year, I cannot see your full history (past a year) and you may be buying chargers on another account, but I do see you are using the VGo2 auto range and this requires a 5v charger and not this 4.2v volt charger so please check and make sure they are correct as well. The chargers do have a 6 month warranty so can be replaced free of charge if there is an issue.
  • Ok - by Will, 21 January 2016
    3
    Works ok but the plastic casing came apart on second use so I had too flu back together, not a big issue really..... JAC Vapour Ltd: All chargers have a 6 month warranty so contact support and they will send you another free of charge.
  • poor chargers - by Dennis, 19 November 2015
    2
    I have been using jac series 510 for a few months now and havebeen really pleased with the performance however I am now on my third charger and that has just packed up really annoying it's a shame because product is otherwise good but might have to go back to using socialites they are not as good as jac but at least you can charge them.... JAC Vapour: Chargers are covered by a 6 month warranty, please contact customer service, as they will get this sorted and if not replaced for free, however going through a charger a month is odd, so I would suggest their is another issue, again Customer service will help if you contact them.
  • 510 charger - by Janice, 12 June 2015
    5
    I prefer the longer lead version
  • just right - by Norman, 31 March 2015
    5
    The perfect charger for the car and home even better if you have the plug sockets that can take USB chargers, had a problem with my charger got in touch with JAC and they sorted it customer service is first class at JAC
  • Great! - by M, 22 December 2014
    5
    Love this. Tiny, incredibly portable, and very handy for charging in the car. Much better than a clunky case.
    The version with the lead is useful for when you need a bit more space to tuck the battery away when charging.
  • Reliable - by David, 9 November 2014
    5
    Great little charger with a light to let you know When Tour batteri is fully charged.
  • JAC more reliable - by Ronny, 2 September 2014
    5
    I have been having issues with an online company sending me chargers that worked initially but soon failed. I have gotten 3 chargers from 3 high street vape retailers, all gave me problems. Chargers are an essential product for a vaper. JAC chargers have always worked perfectly for me.

View all customer reviews Write a customer review

You could receive 20 Gold Points for writing a review and/or rating this product.